Oil & Gas Projects

Pipeline

  • Gemini Midstream - Enable to Carthage
    • Install 47,520’ of 36" .625 Included 8,000' of HDD
  • Energy Transfer - XTO Midkiff
    • Install 47,520’ of 12” Steel Pipeline (Executed concurrently with XTO Pegaus)
  • Energy Transfer - XTO Pegasus
    • Install 95,040’ of 12” Steel Pipeline (Executed concurrently with XTO Midkiff)
  • Medallion - Upton to Epic 20"
    • 50,869’ of 20” .500 WT included over 2,000’ of HDD bores
  • Medallion – Martin Loop North & South
    • 84,480’of 16” .500 WT – Project executed in (3) phases
    • Included 12,500’ through Midland, TX. HDD for Loop 250, Business 20/Railroad, and I-20.

PIPELINE

  • Axiall – HDPE Brine Line
    • Install 43,000’ of 24” HDPE DR9. Included a 3,248’ HDD Road Bore
  • Kinder Morgan – Reineke co2 Pipeline
    • Install 79,200’  of 20” Steel Pipeline
  • Pioneer – O’Daniels Water Line
    • Install 126,720’ of 30” HDPE DR11
  • XTO Global Projects - Goldenchild
    • Install multiple 20", 16", 12", 8" and 4" pipelines
  • XTO Global Projects - PLU 21
    • Install multiple 20", 16", 12", 8" and 4" pipelines

Pipeline

  • Kinder Morgan – ETC & DCP Laterals
    • Install 27,446’ of 20” Steel and 2,700’ of 16” Steel
  • Canyon/James Lake Midstream – Goldsmith Pipeline
    • Install 102,000’ of 12” Steel Pipeline
  • Medallion – Ward Trunkline
    • Install 89,760’ of 16” Steel Pipeline
  • Crossing Rocks Energy – Avary Waterline
    • Install 63,360’ of 12” HDPE DR11
  • Woodland Midstream
    • Install 68,640’ of 12” Steel Pipeline

Facility

  • Plains – Casselman to Goldsmith Reversal
    • Completed civil, structural, mechanical, and electrical work for 10” reversal construction project
  • Enable – Clear Lake Facility RTO Install
    • Fabricated and installed 8”-20” above ground fabrication, civil and structural work, installed and set RTO unit.
  • Enterprise – Fairway to Genoa Junction
    • Installed bi-directional turbine meter run, pig receiver, associated civil, and E&I work.
  • Anadarko – Multi Train SWD Facilities
    • Turnkey construction of multiple multi-train SWD facilities in the Permian Basin.

Facility

  • Simplex/Grinnell – EnLink Midstream Fire Suppressant System
    • Installed 8,700’ of 24” SDR9 HDPE and various lateral lines within a 7 cryo-plant facility. Completed foundation work and installation of main pump house and 6 valve houses 
  • Regency – Amine Treating Facility
    • Installation and pipe design for temporary amine treating facility within an existing compressor station in the Permian basin. Installation and design of a liquid measurement facility.
  • DCP Midstream – Rocky Rhoades Booster Station
    • Installation of grassroots facility consisting of (2) 7044 Wakesha compressors and associated equipment in Granbury, TX.

Facility

  • Centerpoint Energy - Clearlake Plant Train #2
    • Set and installed (6) 3516 compressor packages, header racks, and associated piping
  • Centerpoint Energy – Two Acre Separator Lot
    • Set horizontal slug catcher and installed associated 24” piping and valves.
  • Centerpoint Energy – Cason Separator Lot
    • Set Horizontal slug catcher and installed associated 24” piping, valves, control loops, and meter runs
  • Centerpoint Energy – Sabine Separator Lot
    • Set horizontal slug catcher and associated 16” piping and valves

Facility

  • Centerpoint Energy – Misc. Booster Stations
    • Set and installed multiple 3516 compressor packages at miscellaneous booster stations in East Texas and West Louisiana.
  • Energy Transfer – Separator Facility
    • Build separator facility for existing 36” and 42” natural gas pipelines. Fabricated and installed 36” header system and piping reroutes to meter station.
  • XTO Global Projects - PLU2 Frac Pond
    • Fabricate and install IPC piping and associated equipment for the PLU2 frac pond project.
  • XTO Global Projects - Poker Lake Unit 26 CVB
    • Build hybrid tankless separation facility.
  • XTP Global Projects - Poker Lake Unit 16 CVB
    • Build hybrid tankless separation facility.