Pipeline
- Gemini Midstream - Enable to Carthage
- Install 47,520’ of 36" .625 Included 8,000' of HDD
- Energy Transfer - XTO Midkiff
- Install 47,520’ of 12” Steel Pipeline (Executed concurrently with XTO Pegaus)
- Energy Transfer - XTO Pegasus
- Install 95,040’ of 12” Steel Pipeline (Executed concurrently with XTO Midkiff)
- Medallion - Upton to Epic 20"
- 50,869’ of 20” .500 WT included over 2,000’ of HDD bores
- Medallion – Martin Loop North & South
- 84,480’of 16” .500 WT – Project executed in (3) phases
- Included 12,500’ through Midland, TX. HDD for Loop 250, Business 20/Railroad, and I-20.
PIPELINE
- Axiall – HDPE Brine Line
- Install 43,000’ of 24” HDPE DR9. Included a 3,248’ HDD Road Bore
- Kinder Morgan – Reineke co2 Pipeline
- Install 79,200’ of 20” Steel Pipeline
- Pioneer – O’Daniels Water Line
- Install 126,720’ of 30” HDPE DR11
- XTO Global Projects - Goldenchild
- Install multiple 20", 16", 12", 8" and 4" pipelines
- XTO Global Projects - PLU 21
- Install multiple 20", 16", 12", 8" and 4" pipelines
Pipeline
- Kinder Morgan – ETC & DCP Laterals
- Install 27,446’ of 20” Steel and 2,700’ of 16” Steel
- Canyon/James Lake Midstream – Goldsmith Pipeline
- Install 102,000’ of 12” Steel Pipeline
- Medallion – Ward Trunkline
- Install 89,760’ of 16” Steel Pipeline
- Crossing Rocks Energy – Avary Waterline
- Install 63,360’ of 12” HDPE DR11
- Woodland Midstream
- Install 68,640’ of 12” Steel Pipeline
Facility
- Plains – Casselman to Goldsmith Reversal
- Completed civil, structural, mechanical, and electrical work for 10” reversal construction project
- Enable – Clear Lake Facility RTO Install
- Fabricated and installed 8”-20” above ground fabrication, civil and structural work, installed and set RTO unit.
- Enterprise – Fairway to Genoa Junction
- Installed bi-directional turbine meter run, pig receiver, associated civil, and E&I work.
- Anadarko – Multi Train SWD Facilities
- Turnkey construction of multiple multi-train SWD facilities in the Permian Basin.
Facility
- Simplex/Grinnell – EnLink Midstream Fire Suppressant System
- Installed 8,700’ of 24” SDR9 HDPE and various lateral lines within a 7 cryo-plant facility. Completed foundation work and installation of main pump house and 6 valve houses
- Regency – Amine Treating Facility
- Installation and pipe design for temporary amine treating facility within an existing compressor station in the Permian basin. Installation and design of a liquid measurement facility.
- DCP Midstream – Rocky Rhoades Booster Station
- Installation of grassroots facility consisting of (2) 7044 Wakesha compressors and associated equipment in Granbury, TX.
Facility
- Centerpoint Energy - Clearlake Plant Train #2
- Set and installed (6) 3516 compressor packages, header racks, and associated piping
- Centerpoint Energy – Two Acre Separator Lot
- Set horizontal slug catcher and installed associated 24” piping and valves.
- Centerpoint Energy – Cason Separator Lot
- Set Horizontal slug catcher and installed associated 24” piping, valves, control loops, and meter runs
- Centerpoint Energy – Sabine Separator Lot
- Set horizontal slug catcher and associated 16” piping and valves
Facility
- Centerpoint Energy – Misc. Booster Stations
- Set and installed multiple 3516 compressor packages at miscellaneous booster stations in East Texas and West Louisiana.
- Energy Transfer – Separator Facility
- Build separator facility for existing 36” and 42” natural gas pipelines. Fabricated and installed 36” header system and piping reroutes to meter station.
- XTO Global Projects - PLU2 Frac Pond
- Fabricate and install IPC piping and associated equipment for the PLU2 frac pond project.
- XTO Global Projects - Poker Lake Unit 26 CVB
- Build hybrid tankless separation facility.
- XTP Global Projects - Poker Lake Unit 16 CVB
- Build hybrid tankless separation facility.